Project Title | Entity Name | Host Party | Date Received |
---|---|---|---|
Jiasheng Yangguang Aksu Area Keping 20 Megawatts of Photovoltaic Power Generation Project | Keping Jiasheng Sunshine Power Co., Ltd | China | 01 Apr 2013 |
Methane Recovery and Energy Generation in a Distillery Plant Project (MWDC) in Yangon, Myanmar | Myanmar Winery & Distillery Co., Ltd | Myanmar | 01 Apr 2013 |
Improvement of Power factor in distribution network by Implementing capacitor bank in Kuwait | Ministry of Electricity & Water, State of Kuwait | Kuwait | 31 Mar 2013 |
Efficiency Improvements in Furnaces used in Steel Re-rolling industry in Bhavnagar District, Gujarat, India | Sihor Steel Re-rolling Mills Association | India | 28 Mar 2013 |
Compact Fluorescent Lamps Project in Libya | Ministry of Electricity and Renewable Energy, Libya | Libya | 28 Mar 2013 |
Dois Arcos Landfill Gas Project | Ecopart Assessoria em Negócios Empresarias Ltda | Brazil | 27 Mar 2013 |
Burkina Golden Oils biomass-to-energy project | Burkina Golden Oils SA | Burkina Faso | 27 Mar 2013 |
20 MW LNJP Wind Project Power Project, Rajasthan | LNJ Power Ventures Limited | India | 26 Mar 2013 |
Fujian Putian Qiulu Wind Power Project | Fujian Longyuan Wind Power Co., Ltd. | China | 26 Mar 2013 |
Fujian Putian Baihe Wind Power Project | Fujian Longyuan Wind Power Co., Ltd. | China | 26 Mar 2013 |
Biogas Program for South Africa | Carbon Protocol of SA | South Africa | 26 Mar 2013 |
Low Carbon Water Purification PoA | Sunlabob Renewable Energy Ltd | Lao People's Democratic Republic | 26 Mar 2013 |
Bundled Wind Power Project by EKI Energy Services Limited (EKIESL-CDM.March-13-02) | EKI Energy Services Limied | India | 26 Mar 2013 |
Zhejiang Longyuan Niansijianbei Weixin Wind Power Project | Longyuan Panan Wind Power Co., Ltd | China | 26 Mar 2013 |
Sabha 40MW Photovoltaic Power Plant By REAOL,Libya | Renewable Energy Authority of Libya (REAOL), Libya | Libya | 25 Mar 2013 |
Plantar Carbonization Project - Reduction in emissions from charcoal production by methane abatement | Plantar Carbon Ambiental Ltd | Brazil | 25 Mar 2013 |
Sijitong Hydropower Project | Yunnan Dajiang Hydropower Development Co., Ltd. | China | 24 Mar 2013 |
Changfeng Hydropower Project | Changyang Changfeng Hydropower Co., Ltd. | China | 24 Mar 2013 |
Xiaolong River Hydropower Project | Badong Xiaolonghe Hydropower Development Co., Ltd. | China | 24 Mar 2013 |
Grid Connected Bundled Wind Power Project by M/s. Ghodawat Foods International Pvt. Ltd. in Maharashtra | M/s. Ghodawat Foods International Pvt. Ltd. | India | 23 Mar 2013 |