18:10 27 Jul 24
Prior Consideration of the CDM
** Important Announcement **
As per para 5(b) of CDM EB 118 meeting report, which reads as below:
"Cease receiving requests under the temporary measures when the process for submission of transition requests to the secretariat, under the Article 6.4 mechanism, becomes operational, in accordance with paragraph 5 of decision2/CMP.17"
We would like to inform you that CDM Prior consideration notifications submission after close of business 30 June 2023 are no longer acceptable.
Displaying
2181-2200
of
13375
notifications.
Project Title | Entity Name | Host Party | Date Received |
---|---|---|---|
Qinghai Gonghe 10 MW Grid-Connected Solar PV Power Project | Hainan Prefecture Zhongnan Photovoltaic Power Generation Co., Ltd | China | 30 May 2013 |
Jath Wind Power Project | CLP Wind Farms (India) Private Limited | India | 27 May 2013 |
0.750 MW Wind Power Project by Captain Polyplast Ltd. (Envarrior Consulting Services) | Envarrior Consulting Services | India | 27 May 2013 |
VMFL Project - Reduction of emissions from charcoal production by methane abatement | V & M Forestal Ltda | Brazil | 23 May 2013 |
West Africa Solar Project of Activities (PoA) | Sunray Development Corporation | Burkina Faso Côte d`Ivoire Cape Verde Ghana Guinea Gambia Guinea-Bissau Liberia Mali Mauritania Niger Nigeria Senegal Sierra Leone Togo |
23 May 2013 |
Congjiang Agriculture and Forestry Biomass Power Project | Congjiang Kaidi Green Energy Development Co., Ltd | China | 23 May 2013 |
MPG Geothermal PoA | Marine Power Generation Company Limited | Kenya | 23 May 2013 |
15 MW Grid Connected Solar PV Power Project in Jinchuan City, by Gansu Longchang Photovoltaic Power Co., Ltd | Gansu Longchang Photovoltaic Power Co., Ltd | China | 22 May 2013 |
Generation of 120 MW of electricity by using Waste Furnace Gas at RINL, Visakhapatnam Steel Plant | Rashtriya Ispat Nigam Limited | India | 22 May 2013 |
Improved Cook-Stove Program for Malawi | Renewable Resources Holdings | Malawi | 22 May 2013 |
5 MW Grid Connected Solar PV Power Project in Jinchang City, by Gansu Longchang Photovoltaic Power Co., Ltd | Gansu Longchang Photovoltaic Power Co., Ltd | China | 22 May 2013 |
Biomass based cogeneration project at Jakkepally, Ranga Reddy in Andhra Pradesh, India | Radical Bio-organics Limited | India | 22 May 2013 |
Installation of Supercritical Boiler from base line(Subcritical Boiler) | Saudi Electricity Company(SEC)-KSA | Saudi Arabia | 21 May 2013 |
Conversion of Open Cycle Gas Turbine Power Plant to Combined Cycle Power Plant | Saudi Electricity Company(SEC)-KSA | Saudi Arabia | 21 May 2013 |
Conversion of Open Cycle Gas Turbine Power Plant to Combined Cycle Power Plant | Saudi Electricity Company(SEC)-KSA | Saudi Arabia | 21 May 2013 |
Conversion of Open Cycle Gas Turbine Power Plant to Combined Cycle Power Plant | Saudi Electricity Company(SEC)-KSA | Saudi Arabia | 21 May 2013 |
Replacement of existing crude oil supply via road tankers with Construction of 300Km long Crude Oil pipeline between Qaseem Power Plant-3 and Hail Power Plant-22 | Saudi Electricity Company(SEC)-KSA | Saudi Arabia | 21 May 2013 |
China Aluminum Ningxia Energy Group Zhongwei Sikouzi 20 MWp Solar Photovoltaic Power Project | China Alluminium Ningxia Energy Group Co. Ltd | China | 17 May 2013 |
Tianjin Huadian Nanjiang Phase II 900MW Natural Gas Cogeneration Project | Tianjin Huadian Nanjiang Thermoelectric Power Co., Ltd | China | 17 May 2013 |
Datang International Faku Shuangtaizi Wind Power Project | Liaoning Datang International Faku Wind Power | China | 17 May 2013 |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: