14:19 26 Jul 24
Prior Consideration of the CDM
** Important Announcement **
As per para 5(b) of CDM EB 118 meeting report, which reads as below:
"Cease receiving requests under the temporary measures when the process for submission of transition requests to the secretariat, under the Article 6.4 mechanism, becomes operational, in accordance with paragraph 5 of decision2/CMP.17"
We would like to inform you that CDM Prior consideration notifications submission after close of business 30 June 2023 are no longer acceptable.
Displaying
1941-1960
of
13375
notifications.
Project Title | Entity Name | Host Party | Date Received |
---|---|---|---|
2.2 MW Hydel Power in Nalgonda Dist of Andhra Pradesh | Gayatri Power Private Limited | India | 23 Sep 2013 |
Energy Efficiency improvement by means of fireside cleaning technology | Saline Water Conversion Corporation (SWCC) | Saudi Arabia | 23 Sep 2013 |
Sichuan Mabianhe Guanmaozhou Hydropower Project. | Sichuan Mabian Yutian Phosphorus Electric Co., Ltd | China | 22 Sep 2013 |
Sichuan Huidong Lunan Wind Power Project | Sichuan Nengtou Huidong Wind Power Development Co., Ltd | China | 22 Sep 2013 |
Sichuan Huidong Lama Wind Power Project | Sichuan Nengtou Huidong Wind Power Development Co., ltd | China | 22 Sep 2013 |
Green Phoenix | Ayaan Investment Ltd | Uganda | 22 Sep 2013 |
20 MW Wind Power Project at Ramadurga, Karnataka | Green Infra Wind Power Generation Limited | India | 19 Sep 2013 |
Shree Bhagwati Flour & Foods Private Limited 0.75 MW Wind Power Project 2013 Gujarat | Shree Bhagwati Flour & Foods Private Limited | India | 19 Sep 2013 |
Bundled Solar Power Project by EKI Energy Services Limited (EKIESL-CDM.Sep-13-03) | EKI Energy Services Limited | India | 17 Sep 2013 |
Cikaengan Hydropower Project in Indonesia | PT. Cikaengan Tirta Energi | Indonesia | 17 Sep 2013 |
10 MW Solar PV Power Project at NTPC-Talcher Kaniha | NTPC Limited | India | 13 Sep 2013 |
Bio-fertilizer (liquid form) and organic fertilizer (powder form) | Siddaganga Oil Extractions Private Limited | India | 13 Sep 2013 |
10 MW Solar PV Power Project at NTPC-Unchahar | NTPC Limited | India | 13 Sep 2013 |
Bundled Solar Power Project by EKI Energy Services Limited (EKIESL-CDM.Sep-13-02) | EKI Energy Services Limited | India | 12 Sep 2013 |
Upper Marsyangdi "A" (UM-0) Hydroelectric Project. | Sinohydro-Sagarmatha Power Company (P) Ltd | Nepal | 10 Sep 2013 |
Fuel switch from fossil fuels to biomass residue in Haft Tappeh sugarcane boiler | Industry Renovation Company of Iran (IRCI) , Mehr Renewables Energies Company (MRE) | Iran (Islamic Republic of) | 09 Sep 2013 |
Upper Madi Hydroelectric Project | China International Water & Electric Corp. | Nepal | 09 Sep 2013 |
Methane Recovery and Utilization at PT. Siringo Ringo Palm Oil Mill,Sumatera Utara, Indonesia | PT. Siringo Ringo | Indonesia | 07 Sep 2013 |
Yunnan Province Nanpan River Laoduzhai Hydropower Project | Yunnan Huaning County Xinhuayuan Hydropower Co., Ltd. | China | 06 Sep 2013 |
Solar Power Project in Nalgonda district, Andhra Pradesh state, India | Winsol Green Power Project Private Limited | India | 06 Sep 2013 |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: