Prior Consideration of the CDM


** Important Announcement **

As per para 5(b) of CDM EB 118 meeting report, which reads as below:

"Cease receiving requests under the temporary measures when the process for submission of transition requests to the secretariat, under the Article 6.4 mechanism, becomes operational, in accordance with paragraph 5 of decision2/CMP.17"

We would like to inform you that CDM Prior consideration notifications submission after close of business 30 June 2023 are no longer acceptable.
Search Criteria
Date Received from: to:
* format DD/MM/YYYY
Host Party
Project Title
<< 1 ... | 76 | 77 | 78 | 79 | 80 | ... 669 >>
Displaying 1541-1560 of 13375 notifications.
Project Title Entity Name Host Party Date Received
Large Scale, Arias Wind Farm 70 MW UTE (National Administration of Electricity Generation and Transport) Uruguay 08 Aug 2014
Large Scale, Mc Meekan Wind Farm 70 MW. UTE (National Administration of Electricity Generation and Transport) Uruguay 08 Aug 2014
Small scale, 10 MW Rincón del Bonete Wind Farm 10 MW UTE (National Administration of Electricity Generation and Transport) Uruguay 08 Aug 2014
Large Scale, Valentines Wind Farm 70 MW UTE (National Administration of Electricity Generation and Transport) Uruguay 08 Aug 2014
Xhayimai Energy Recovery Centre Innovative Strategic Projects Group (pty) Ltd. South Africa 08 Aug 2014
Nakivubo WWTP Methane Capture and Utilisation Project National Water and Sewerage Corporation (NWSC) Uganda 08 Aug 2014
Large Scale, 70 MW Addition of a new 70 MW turbine at the Hydroelectic Plant Dr. Gabriel Terra UTE (National Administration of Electricity Generation and Transport) Uruguay 08 Aug 2014
Bundled renewable power project by EKI ESL 08-2014 EKI Energy Services Limited India 07 Aug 2014
The Swaziland Sawmill Waste Conversion Project The FX Group South Africa 06 Aug 2014
Bundled renewable power project by EKI ESL 08-2014 EKI Energy Services Limited India 06 Aug 2014
Greenhouse Gas Abatement from energy efficient power generation through Gas Engines (195 MW Project) United Ashuganj Energy Limited Bangladesh 04 Aug 2014
10 MW Wind Power Project of Beta Power (Pvt) Limited Beta Power (Pvt.) Ltd Sri Lanka 04 Aug 2014
Recovering the waste heat of existing 100MW open cycle gas turbine at Mobarake Steel Company power station Industrial Renovation Company of Iran Iran (Islamic Republic of) 04 Aug 2014
6.3 MW Wind Power Plant of SMC at Ratdi in Porbandar district of Gujarat State, India Surat Municipal Corporation India 31 Jul 2014
West Karun Combined Cycle Power Plant MAPNA West Karun Power Generation Company, Mehr Renewable Energies Company Iran (Islamic Republic of) 29 Jul 2014
Brahl Top Small Hydro Electric Project in Himachal Pradesh M/s Padhas Hydel Projects Pvt. Ltd India 28 Jul 2014
Bundled renewable power project by EKI ESL 07-2014. EKI Energy Services Limited India 28 Jul 2014
Bundled renewable power project by EKI ESL 07-2014. EKI Energy Services Limited India 28 Jul 2014
Greenhouse > emissions reduction on swine production by means the installation of biodigester at Santa Terezinha Farm, Sumaré-SP Amarildo Basso Ração Ltda Brazil 25 Jul 2014
Bundled renewable power project by (EKI ESL 07-2014) EKI Energy Services Limited India 22 Jul 2014