Project Title
<< 1 ... | 653 | 654 | 655 | 656 | 657 | ... 669 >>
Displaying 13081-13100 of 13375 notifications.
Project Title Entity Name Host Party Date Received
Shuangliao Municipal Solid Waste Integration Disposal Project TYTF International Environment Consulting (Beijing) Co., Ltd China 04 Feb 2009
1.25 MW Wind Electric Generators (WEG’s) in Mettubavi Village Pollachi Taluka of Coimbatore District in Tamil Nude, India Arasi Fabrics India 04 Feb 2009
Kaifeng Jinkai chemical industry Boiler Replacement Project TYTF International Environment Consulting (Beijing) Co., Ltd China 04 Feb 2009
Grid connected Wind Power Project in Tamil Nadu, India Sree Rayalaseema Hi-Strength Hypo limited India 04 Feb 2009
Baoji Zhu Jia Tan 9.6 MW Hydropower Development, Shaanxi, China Zeroemissions China 04 Feb 2009
Bundled Wind Power Project at Jogimatti and Sinner Engineers and Builders India 04 Feb 2009
Kaifeng Jinkai CO2 Recovery Project TYTF International Environment Consulting (Beijing) Co., Ltd China 04 Feb 2009
7.5 MW JBEL Biomass Power Project in Haryana Sri Jyoti Renewable Energy Pvt. Ltd. India 04 Feb 2009
Beijing Kaimeite CO2 Recovery Project TYTF International Environment Consulting (Beijing) Co., Ltd China 04 Feb 2009
K-water 0.96MW bundle small-scale hydroelectric power plants project Korea Water Resources Corporation (K-water) Republic of Korea 04 Feb 2009
Daegu City Gas fuel switching CDM bundling project DAEGU CITY GAS CO., LTD. Republic of Korea 03 Feb 2009
Afforestation project in Chanchai village, Dhari, Taluka of Amereli District Gujrat, India Vijaybhai malabhai Bharwad & sons. India 02 Feb 2009
Green House Gas Abatement Project through Replacement of smaller less efficient Blast Furnaces with one new more efficient Blast Furnace Tata Steel Ltd. India 31 Jan 2009
Green House Gas Abatement through Recovery of Waste Heat of the Flue Gas from Hot Stoves of ‘I’ Blast Furnace Tata Steel Ltd. India 31 Jan 2009
Green House Gas Abatement through Installation of Pellet Plant Tata Steel Ltd. India 31 Jan 2009
Green House Gas Abatement Project through Installation of Top Gas Pressure Recovery Turbine in ‘I’ Blast Furnace Tata Steel Ltd. India 31 Jan 2009
Biomass Gasification for Thermal Energy Generation at Bala Murugans Chemicals, Tamil Nadu, India Zeroemmissions India 30 Jan 2009
Installation of 12 TPH biomass based boiler at Dalkhola in West Bengal. Tantia Agrochemicals Private Limited India 30 Jan 2009
Electricity generation using windmill of capacity 1.25 MW St. John Freight Systems Ltd. India 30 Jan 2009
SML Waste Heat - CDM Project Sree Metaliks Limited India 30 Jan 2009