02:18 18 Aug 24
Prior Consideration of the CDM
** Important Announcement **
As per para 5(b) of CDM EB 118 meeting report, which reads as below:
"Cease receiving requests under the temporary measures when the process for submission of transition requests to the secretariat, under the Article 6.4 mechanism, becomes operational, in accordance with paragraph 5 of decision2/CMP.17"
We would like to inform you that CDM Prior consideration notifications submission after close of business 30 June 2023 are no longer acceptable.
Displaying
12581-12600
of
13375
notifications.
Project Title | Entity Name | Host Party | Date Received |
---|---|---|---|
PCH BOA FE 24 MW small hydropower plant | Boa Fe Energetica SA | Brazil | 26 May 2009 |
PCH TABAUNA 27 MW small hydropower plant | Hidrotermica SA | Brazil | 26 May 2009 |
PCH SERRA DO AZEITE 13,5 MW small hydropower plant | Hidrotermica SA | Brazil | 26 May 2009 |
PCH Quartel 2 30 MW small hydropower plant | Quartel Dois Energetica SA | Brazil | 26 May 2009 |
PCH Quartel 1 30 MW small hydropower plant | Quartel Um Energetica SA | Brazil | 26 May 2009 |
PCH AUTODROMO 24 MW small hydropower plant | Autodromo Energetica SA | Brazil | 25 May 2009 |
15 MW Biomass based Power Plant at Tirunelveli District, Tamil Nadu State, India | Auro Mira Biopwer India Private Limited | India | 25 May 2009 |
Cogeneration Power Plant at Lauriya, Bihar | Hindustan Petroleum Corporation Ltd. | India | 25 May 2009 |
Cogeneration Power Plant at Sugauli, Bihar | Hindustan Petroleum Corporation Ltd. | India | 25 May 2009 |
PCH QUARTEL 3 30 MW small hydropower plant | Quartel Tres Energetica SA | Brazil | 25 May 2009 |
PCH SAO PAULO 24 MW small hydropower plant | Sao Paulo Energetica SA | Brazil | 25 May 2009 |
Methane recovery system in MPOB Palm oil mill in Labu | Ronser Bio-Tech Sdn Bhd | Malaysia | 22 May 2009 |
Wind Energy Project in different states of India by Param Capitals R.P. Ltd. | EnKing International on behalf of M/s Param Capitals R. P. Ltd. | India | 22 May 2009 |
6.6 MW run of river project in Bwindi Forest National Park | Eco Power Uganda Limited | Uganda | 22 May 2009 |
Santa Lucia Rice Husk Cogeneration Project | OneCarbon on behalf of Santa Lucia S.A. | Brazil | 22 May 2009 |
9 MW small hydro electric project in Karnataka by Sharan Powers Private Limited | Sharan Power Private Limited, Auromira Energy | India | 20 May 2009 |
Methane combustion and renewable electricity generation project by COPASA MG | COPASA Companhia de Saneamento de Minas Gerais | Brazil | 20 May 2009 |
Tamarugal Wind Farm | SoWiTec trading GmbH | Chile | 20 May 2009 |
Use of water in fuel emulsion technology to enhance energy efficiency in industrial boilers and furnaces in India | Technergy ESCo Private Ltd. | India | 20 May 2009 |
Arica Wind Farm | SoWiTec trading GmbH | Chile | 20 May 2009 |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: