07:29 03 Jul 25
Prior Consideration of the CDM
** Important Announcement **
As per para 5(b) of CDM EB 118 meeting report, which reads as below:
"Cease receiving requests under the temporary measures when the process for submission of transition requests to the secretariat, under the Article 6.4 mechanism, becomes operational, in accordance with paragraph 5 of decision2/CMP.17"
We would like to inform you that CDM Prior consideration notifications submission after close of business 30 June 2023 are no longer acceptable.
Displaying
12221-12240
of
13375
notifications.
Project Title | Entity Name | Host Party | Date Received |
---|---|---|---|
The project of Utilization of the recovered Carbide Furnace Gas for Calcination in Inner Mongolia Junzheng Chemical Co.,Ltd. | Inner Mongolia Junzheng Chemincal Co., Ltd | China | 06 Aug 2009 |
Programmatic Project of electricity generation from renewable synthsis gas by KOAR Energy Dominicana | KOAR Energy Dominicana, Dominican Comapny fully owned by KOAR Energy Resources USA | Dominican Republic | 05 Aug 2009 |
“Cluster Approach for Using Biogas As a Medium to Energise the Villages of Jharkhand” | Deepak Srivastava | India | 05 Aug 2009 |
Puerto Chivos Landfill | ENERGREEN Atizapan S.A. de C.V. | Mexico | 04 Aug 2009 |
Yunfu Yehua Waste Heat Recovery and Utilization Project | Yunfu City Yehua Chemical Co., Ltd in Guangdong Province China | China | 04 Aug 2009 |
San Luis Potosi Landfills | ENERGREEN San Luis S.A.P.I. de C.V. | Mexico | 04 Aug 2009 |
Waste Heat based power project | Maruti Suzuki India Limited, Gurgaon, Haryana, India | India | 04 Aug 2009 |
Xinjiang Alashankou Phase I Wind Power Project | Guodian Xinjiang Alashankou Wind Power Development Co., Ltd. China | China | 04 Aug 2009 |
Bundled Grid Connected Zero Emission Wind Power Generation in Tamilnadu | Abi Energy Consultancy Services (P) Ltd. | India | 04 Aug 2009 |
Combination of biomass energy production in high capacity automobile production plant near Melloussa | RTM (Renault Tanger Mediterranée SAS) | Morocco | 03 Aug 2009 |
Husk based co-generation plant at Samudrapalle, India | Parag Milk Foods Private Limited | India | 03 Aug 2009 |
Fuel Switching from Mazout (Heavy Fuel Oil) to Natural Gas in Misr Fine Spinning & Weaving and Misr Beida Dyers at Kafr El Dawar | Egypt for Spinning, Weaving and Dying | Egypt | 03 Aug 2009 |
6MW grid connected wind energy project at Maharashtra by ITC Limited – Hotel Division | ITC Limited – Hotel Division | India | 03 Aug 2009 |
Diandong Cement 4.5 MW Low Temperature Waste Heat Recovery Power Project | Yunnan Diandong Cement Co., Ltd. | China | 03 Aug 2009 |
1.35 MW Captive Power Generation Plant | MAC Oil Palm Limited | India | 01 Aug 2009 |
Husk based co-generation plant at Samudrapalle, India | Parag Milk Foods Private Limited | India | 01 Aug 2009 |
Fuel switch measures at tyre manufacturing facilities | CEAT Limited | India | 01 Aug 2009 |
Oaxaca I Wind Farm | Energias Ambientales de Oaxaca S.A. de C.V. | Mexico | 31 Jul 2009 |
Partial substitution of fossil fuels with biomass at Semen Gresik cement plant in Tuban | SINDICATUM CARBON CAPITAL for PT Semen Gresik (Persero) Tbk. | Indonesia | 31 Jul 2009 |
CCHP CDM Project at Sun Pharmaceuticals Industries Limited, India | Sun Pharmaceutical Industries Ltd. | India | 31 Jul 2009 |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: