12:28 24 Jul 24
Prior Consideration of the CDM
** Important Announcement **
As per para 5(b) of CDM EB 118 meeting report, which reads as below:
"Cease receiving requests under the temporary measures when the process for submission of transition requests to the secretariat, under the Article 6.4 mechanism, becomes operational, in accordance with paragraph 5 of decision2/CMP.17"
We would like to inform you that CDM Prior consideration notifications submission after close of business 30 June 2023 are no longer acceptable.
Displaying
1201-1220
of
13375
notifications.
Project Title | Entity Name | Host Party | Date Received |
---|---|---|---|
MINERAGIK CBM, CMM & VAM PROJECTS | MINERA SIDERURGICA DE COAHUILA SA DE C.V. | Mexico | 10 Nov 2015 |
Green Haiti Kit Sanitaire & Ecologies | Fondation Sequin | Haiti | 09 Nov 2015 |
GHG Emission Reduction from Adopting Sustainable Agricultural Practices in Shahjewna Farms of District Jhang in Pakistan | SKAFS CONSULTANTS | Pakistan | 09 Nov 2015 |
5.566 MW Solar Power Project at Andhra Pradesh by Raajratna Energy Holdings Pvt. Ltd | Raajratna Energy Holdings Pvt. Ltd (REHPL) | India | 06 Nov 2015 |
PoA: Solar Head of State Executive Residence Installations | Solar Head of State | Antigua and Barbuda Saint Lucia |
05 Nov 2015 |
Calango 6 Wind Power Plat CDM Project Activity | Calango 6 Energia Renovavel SA | Brazil | 05 Nov 2015 |
Santana 2 Wind Power Plat CDM Project Activity | Santana 2 Energia Renovavel SA | Brazil | 05 Nov 2015 |
Santana 1 Wind Power Plat CDM Project Activity | Santana 1 Energia Renovavel SA | Brazil | 05 Nov 2015 |
Renewable Energy Project, India | Kanaka Management Services Private Limited | India | 05 Nov 2015 |
PoA: Light for All | Prime Minister's Cabinet of the Republic of Benin (Primature du Bénin) | Benin | 04 Nov 2015 |
PoA: Programmatic CDM for Solar Power Plants Generation in Africa | Raise Energy Solutions, LLC | Angola Burundi Benin Burkina Faso Central African Republic Democratic Republic of the Congo Comoros Cape Verde Eritrea Ethiopia Guinea Gambia Equatorial Guinea Liberia Madagascar Mali Mozambique Mauritania Malawi Niger Rwanda Senegal Sierra Leone Sao Tome and Principe Chad Togo United Republic of Tanzania Uganda Zambia |
03 Nov 2015 |
PoA: Energy efficiency PoA for street lightening improvement through switch to LED bulbs | Raise Energy Solutions LLC | Angola Burundi Benin Burkina Faso Central African Republic Democratic Republic of the Congo Comoros Cape Verde Eritrea Ethiopia Guinea Gambia Equatorial Guinea Liberia Madagascar Mali Mozambique Mauritania Malawi Niger Rwanda Senegal Sierra Leone Sao Tome and Principe Chad Togo United Republic of Tanzania Uganda Zambia |
03 Nov 2015 |
Conejo Solar Project | Conejo Solar SPA | Chile | 02 Nov 2015 |
PoA for the Construction of Municipal Solid Waste (MSW) Industrial Sorting and Composting Eco-Units and Generation of Electricity within the Municipalities of the Economic Community of West African States (ECOWAS) | HHOLDING GROUPE EOULEE SA | Benin Burkina Faso Côte d`Ivoire Cape Verde Ghana Guinea Gambia Guinea-Bissau Liberia Mali Niger Nigeria Senegal Sierra Leone Togo |
28 Oct 2015 |
“Proyecto Hidroelectrico Arenal Etapa I-II” | Energias Limpias del Yaguala, S.A. de C.V. | Honduras | 28 Oct 2015 |
49.50 MW Gumat Nar Hydropower Project | Bedrock Private Limited | Pakistan | 26 Oct 2015 |
Bundled renewable power project by EKI ESL–2015-41 | EKI Energy Services Limited | India | 23 Oct 2015 |
250 MW (5 blocks of 50 MW) Solar Photo Voltaic Project at Anantapur (AP) | NTPC Limited | India | 23 Oct 2015 |
Thermo-cell- Cement and Concrete Ltd. | Eco Beton ltee | Mauritius | 22 Oct 2015 |
POA for Eco-Health in Sub-saharan Africa | Holding Group Eoulee S.A. | Benin Burkina Faso Côte d`Ivoire Cape Verde Ghana Guinea Gambia Guinea-Bissau Liberia Mali Niger Nigeria Senegal Sierra Leone Togo |
16 Oct 2015 |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: