Project: 2671 Xiangfan Huaxin Cement 7.5MW Waste Heat Recovery as Power Project - History
Project 2671: Xiangfan Huaxin Cement 7.5MW Waste Heat Recovery as Power Project
Request for review Request 1
Request 2
Request 3


EB meeting: EB50
(at which the Board considers the request(s) for review, decides whether to undertake the review and, if so, determine its scope and selects a review team)

Initial comments:
Joint Response (62 KB)
Enclosure (1216 KB)
Enclosure 1 (1269 KB)
Enclosure 2 (499 KB)
Enclosure 3 (1440 KB)
Enclosure 4 (125 KB)
Enclosure 5 (558 KB)
Enclosure 6 (668 KB)
Enclosure 7 (2529 KB)
Enclosure 8 (1452 KB)
Enclosure 9 (505 KB)
Review Scope (107 KB)

EB meeting: EB51
(at which the report of the review team was/will be considered)

Data before corrections

CDM-PDD project design document (1066 KB)


PDD appendices
Appendix 1 - Enclosure (819 KB)
Appendix 2 - Enclosure 1 (269 KB)
Appendix 3 - Enclosure 2 (1016 KB)
Appendix 4 - Enclosure 3 (23 KB)
Validation Report Validation report (790 KB)