Project: 2632 AMA08-W-21, Methane Recovery in Wastewater Treatment, Johor, Malaysia - History
Project 2632: AMA08-W-21, Methane Recovery in Wastewater Treatment, Johor, Malaysia
Request for review Request 1
Request 2
Request 3

Data before corrections

Amount of Reductions 21,822 metric tonnes CO2 equivalent per annum
CDM-PDD project design document (326 KB)


PDD appendices
Appendix 1 - Enclosure (35 KB)
Appendix 2 - Enclosure 1 (714 KB)
Appendix 3 - Enclosure 2 (11 KB)
Appendix 4 - Enclosure 3 (210 KB)
Validation Report Validation report (474 KB)