Reference number of the proposed CDM project activity/programme of activities (PoA) submitted for registration | 2632 |
---|---|
Title of the proposed CDM project activity/PoA submitted for registration | AMA08-W-21, Methane Recovery in Wastewater Treatment, Johor, Malaysia |
Please indicate, in accordance with paragraphs 37 and 40 of the CDM modalities and procedures, which validation requirement(s) may require review. A list of requirements is provided below. Please provide reasons in support of the request for review. Including any supporting documentation. | |
The following are requirements derived from paragraph 37 of the CDM modalities and procedures: | |
![]() ![]() ![]() ![]() ![]() ![]() ![]() |
|
The following are requirements derived from paragraph 40 of the CDM modalities and procedures: | |
![]() ![]() ![]() ![]() ![]() ![]() |
|
![]() |
|
Additional information | |
Minor issue 1: The DOE should confirm the dates of the project start date, letter of intent and LERPA as there are inconsistencies between the validation report and the PDD. Minor issue 2: The DOE should confirm that the same baseline wastewater treatment system applies to the additional methane generation which is due to the 10% increase in the FFB processed considered in the project activity in line with EB 41, Annex 20, para. 16. Minor issue 3: The PP/DOE are requested to ensure that the volume of wastewater treated (Qy,ww) will be monitored in line with the requirements of EB 41, Annex 20, para 12 (b). Minor issue 4: The PP/DOE are requested to ensure that the monitoring of the kWbiomass, kWfossil fuel and kWproject are in line with the requirements of AMS-III.H v.9 and to amend these energy data units and parameter names from kW to kWh. In addition, the PP/DOE should explain why the consumption of fossil fuel was not included in the monitoring plan as per the requirements of the same methodology (i.e. the PDD should provide a separate table in section B.7.1). |
|
Date | 01 Sep 09 |