Project: 2516 Zibo Hongda Coking Co. Ltd. Coke Dry Quenching and Waste Heat Utilization for Power Generation Project - History
Project 2516: Zibo Hongda Coking Co. Ltd. Coke Dry Quenching and Waste Heat Utilization for Power Generation Project
Request for review Request 1
Request 2
Request 3


EB meeting: EB49
(at which the Board considers the request(s) for review, decides whether to undertake the review and, if so, determine its scope and selects a review team)

Initial comments:
Joint Response (4597 KB)
Enclosure (134 KB)

Data before corrections

Methodologies Used ACM0012 ver. 2 - Consolidated baseline methodology for GHG emission reductions for waste gas or waste heat or waste pressure based energy system”
CDM-PDD project design document (440 KB)


PDD appendices
Appendix 1 - Enclosure (1394 KB)
Appendix 2 - Enclosure 1 (134 KB)
Validation Report Validation report (547 KB)

Data before approval of the request for post-registration changes on 14 Mar 2014

Link to PRC form PRC
CDM-PDD project design document (556 KB)


PDD appendices
Appendix 1 - Enclosure (1394 KB)
Appendix 2 - Enclosure 1 (134 KB)