06:19 28 Jan 25
Project:
2516 Zibo Hongda Coking Co. Ltd. Coke Dry Quenching and Waste Heat Utilization for Power Generation Project
- History
Project | 2516: Zibo Hongda Coking Co. Ltd. Coke Dry Quenching and Waste Heat Utilization for Power Generation Project |
---|---|
Request for review |
Request 1
Request 2 Request 3 EB meeting: EB49 (at which the Board considers the request(s) for review, decides whether to undertake the review and, if so, determine its scope and selects a review team) Initial comments: Joint Response (4597 KB) Enclosure (134 KB) |
Data before corrections
Methodologies Used |
ACM0012 ver. 2 -
Consolidated baseline methodology for GHG emission reductions for waste gas or waste heat or waste pressure based energy system”
|
---|---|
CDM-PDD |
project design document (440 KB)
PDD appendices Appendix 1 - Enclosure (1394 KB) Appendix 2 - Enclosure 1 (134 KB) |
Validation Report | Validation report (547 KB) |
Data before approval of the request for post-registration changes on 14 Mar 2014
Link to PRC form | PRC |
---|---|
CDM-PDD |
project design document (556 KB)
PDD appendices Appendix 1 - Enclosure (1394 KB) Appendix 2 - Enclosure 1 (134 KB) |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: