Project: 2516 Zibo Hongda Coking Co. Ltd. Coke Dry Quenching and Waste Heat Utilization for Power Generation Project - Request for post-registration changes
Project 2516 Zibo Hongda Coking Co. Ltd. Coke Dry Quenching and Waste Heat Utilization for Power Generation Project
PRC ref PRC-2516-002
Process track Prior approval
DOE ERM CVS
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? Yes

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? No
Applicable crediting period 25 Nov 09 - 24 Nov 19
Assessment opinion Assessment opinion (96 KB)
Revised PDD Revised PDD (534 KB)   Revised PDD - track changes (535 KB)
Supplementary documents
Signed form Signed form (236 KB)
DOE clarification
VVS version VVS 2.0
Current status 26 Mar 14 - Approved
Effective approval date: 14 Mar 14
Historic statuses 04 Feb 14 - Published
04 Feb 14 - Summary note being prepared
21 Feb 14 - Awaiting EB decision