Project: 2185 Methane Capture and On-site Power Generation Project at Sungai Kerang Palm Oil Mill in Sitiawan, Perak, Malaysia - History
Project 2185: Methane Capture and On-site Power Generation Project at Sungai Kerang Palm Oil Mill in Sitiawan, Perak, Malaysia

Data before approval of the request for post-registration changes on 27 Sep 2013

Link to PRC form PRC
CDM-PDD project design document (1241 KB)


PDD appendices
Appendix 1 - 2185 2 Revised PDD tracked changes (1225 KB)
Appendix 2 - 2185 2 SD1 #2 Biogas Burner Commissioning (640 KB)
Appendix 3 - 2185 2 SD1 Boiler #2 Biogas Burner Installation (578 KB)
Appendix 4 - 2185 2 SD1 Boiler #2 Biogas Burner Operation (250 KB)
Appendix 5 - 2185 2 SD1 Boiler #2 Biogas Burner Testing (748 KB)
Appendix 6 - 2185 2 SD10 TNB Report on TDL (383 KB)
Appendix 7 - 2185 2 SD3 Enclosed Flare System T&C Report (455 KB)
Appendix 8 - 2185 2 SD3 Jobsheet Enclosed Flare System Start (80 KB)
Appendix 9 - 2185 2 SD7 SGKD_Boilers Operation Hour (10037 bytes)
Appendix 10 - 2185 2 SD9 PTM Malaysia Grid Baseline_2008 (17 KB)

Validation opinion on changes in PDD Validation opinion on changes in PDD (656 KB)

Data before acceptance of changes in PDD on 15 Jun 2012

CDM-PDD project design document (795 KB)


PDD appendices
Appendix 1 - Enclosure (244 KB)
Appendix 2 - Enclosure 1 (2685 KB)