13:26 28 Jan 25
Project:
2185 Methane Capture and On-site Power Generation Project at Sungai Kerang Palm Oil Mill in Sitiawan, Perak, Malaysia
- History
Project | 2185: Methane Capture and On-site Power Generation Project at Sungai Kerang Palm Oil Mill in Sitiawan, Perak, Malaysia |
---|
Data before approval of the request for post-registration changes on 27 Sep 2013
Link to PRC form | PRC |
---|---|
CDM-PDD |
project design document (1241 KB)
PDD appendices Appendix 1 - 2185 2 Revised PDD tracked changes (1225 KB) Appendix 2 - 2185 2 SD1 #2 Biogas Burner Commissioning (640 KB) Appendix 3 - 2185 2 SD1 Boiler #2 Biogas Burner Installation (578 KB) Appendix 4 - 2185 2 SD1 Boiler #2 Biogas Burner Operation (250 KB) Appendix 5 - 2185 2 SD1 Boiler #2 Biogas Burner Testing (748 KB) Appendix 6 - 2185 2 SD10 TNB Report on TDL (383 KB) Appendix 7 - 2185 2 SD3 Enclosed Flare System T&C Report (455 KB) Appendix 8 - 2185 2 SD3 Jobsheet Enclosed Flare System Start (80 KB) Appendix 9 - 2185 2 SD7 SGKD_Boilers Operation Hour (10037 bytes) Appendix 10 - 2185 2 SD9 PTM Malaysia Grid Baseline_2008 (17 KB) |
Validation opinion on changes in PDD | Validation opinion on changes in PDD (656 KB) |
Data before acceptance of changes in PDD on 15 Jun 2012
CDM-PDD |
project design document (795 KB)
PDD appendices Appendix 1 - Enclosure (244 KB) Appendix 2 - Enclosure 1 (2685 KB) |
---|
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: