08:48 18 Feb 26
Project:
2185 Methane Capture and On-site Power Generation Project at Sungai Kerang Palm Oil Mill in Sitiawan, Perak, Malaysia
- Request for post-registration changes
| Project | 2185 Methane Capture and On-site Power Generation Project at Sungai Kerang Palm Oil Mill in Sitiawan, Perak, Malaysia |
|---|---|
| PRC ref | PRC-2185-001 |
| Process track | Prior approval |
| DOE | TÜV NORD |
|
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
| Methodology(ies) list | |
| Standardized baseline(s) list | |
| DOE conducted validation of the changes | Prior to commencement of a verification for the project activity or PoA stated above |
| Type of submission |
Permanent changes from the monitoring plan or the monitoring methodology
|
| Applicable crediting period | 01 Jun 09 - 31 May 19 |
| Assessment opinion |
Assessment opinion (709 KB)
|
| Revised PDD |
Revised PDD (1154 KB)
Revised PDD - track changes (1202 KB)
|
| Supplementary documents |
Appendix 1 - 2185 CashFlow.xls (247 KB)
|
| Signed form |
Signed form (53 KB)
|
| DOE clarification | |
| VVS version | VVS 2.0 |
| Current status | 27 Sep 13 -
Approved
Effective approval date: 27 Sep 13
|
| Historic statuses |
20 Aug 13 -
Published 20 Aug 13 - Summary note being prepared 06 Sep 13 - Awaiting EB decision |

Assessment opinion
Appendix 1 - 2185 CashFlow.xls
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: