Project:
2185 Methane Capture and On-site Power Generation Project at Sungai Kerang Palm Oil Mill in Sitiawan, Perak, Malaysia
- Request for post-registration changes
Project | 2185 Methane Capture and On-site Power Generation Project at Sungai Kerang Palm Oil Mill in Sitiawan, Perak, Malaysia |
---|---|
PRC ref | PRC-2185-001 |
Process track | Prior approval |
DOE | TÜV NORD |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | Prior to commencement of a verification for the project activity or PoA stated above |
Type of submission |
Permanent changes from the monitoring plan or the monitoring methodology
|
Applicable crediting period | 01 Jun 09 - 31 May 19 |
Assessment opinion | Assessment opinion (709 KB) |
Revised PDD | Revised PDD (1154 KB) Revised PDD - track changes (1202 KB) |
Supplementary documents |
Appendix 1 - 2185 CashFlow.xls (247 KB)
|
Signed form | Signed form (53 KB) |
DOE clarification | |
VVS version | VVS 2.0 |
Current status | 27 Sep 13 -
Approved
Effective approval date: 27 Sep 13
|
Historic statuses |
20 Aug 13 -
Published 20 Aug 13 - Summary note being prepared 06 Sep 13 - Awaiting EB decision |