Project: 2018 Baihubao 33.75MW Wind Power Generation Project in Shanxi Province - History
Project 2018: Baihubao 33.75MW Wind Power Generation Project in Shanxi Province
Request for review Request 1
Request 2
Request 3

Data before corrections

Amount of Reductions 69,337 metric tonnes CO2 equivalent per annum
CDM-PDD project design document (555 KB)


PDD appendices
Appendix 1 - Enclosure (229 KB)
Validation Report Validation report (354 KB)

Data before approval of the request for post-registration changes on 21 Dec 2012

Link to PRC form PRC
CDM-PDD project design document (608 KB)


PDD appendices
Appendix 1 - Final Enclosure (236 KB)