Project: 2018 Baihubao 33.75MW Wind Power Generation Project in Shanxi Province - Request for post-registration changes
Project 2018 Baihubao 33.75MW Wind Power Generation Project in Shanxi Province
PRC ref PRC-2018-001
Process track Issuance
DOE SGS
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? Yes
Applicable crediting period 23 Jan 09 - 22 Jan 16
Assessment opinion Assessment opinion (430 KB)
Revised PDD Revised PDD (943 KB)   Revised PDD - track changes (940 KB)
Supplementary documents
Signed form Signed form (1516 KB)
DOE clarification
VVS version VVS 2.0
Current status 21 Dec 12 - Approved
Effective approval date: 21 Dec 12
Historic statuses 22 Nov 12 - Request published