Project: 0867 Kim Loong Methane Recovery for Onsite Utilization Project at Kota Tinggi, Johor, Malaysia. - History
Project 0867: Kim Loong Methane Recovery for Onsite Utilization Project at Kota Tinggi, Johor, Malaysia.

Data before approval of the request for post-registration changes on 08 Jan 2013

Link to PRC form PRC
CDM-PDD project design document (828 KB)


PDD appendices
Appendix 1 - Enclosure 1 (2857 KB)
Appendix 2 - Enclosure 2 (53 KB)