Project: 0867 Kim Loong Methane Recovery for Onsite Utilization Project at Kota Tinggi, Johor, Malaysia. - Request for post-registration changes
Project 0867 Kim Loong Methane Recovery for Onsite Utilization Project at Kota Tinggi, Johor, Malaysia.
PRC ref PRC-0867-001
Process track Prior approval
DOE SIRIM
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes Prior to commencement of a verification for the project activity or PoA stated above
Type of submission Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? No

Changes to the project or programme design
  • Changes have an impact on: None of the above
Applicable crediting period 01 Feb 09 - 31 Jan 16
Assessment opinion Assessment opinion (258 KB)
Revised PDD Revised PDD (1889 KB)   Revised PDD - track changes (2040 KB)
Supplementary documents
Signed form Signed form (557 KB)
DOE clarification
VVS version VVS 2.0
Current status 08 Jan 13 - Approved
Effective approval date: 08 Jan 13
Historic statuses 13 Nov 12 - Published
28 Nov 12 - Awaiting DOE clarifications
12 Dec 12 - DOE clarifications received
12 Dec 12 - Summary note being prepared
18 Dec 12 - Awaiting EB decision