06:13 16 Nov 25
Project:
0867 Kim Loong Methane Recovery for Onsite Utilization Project at Kota Tinggi, Johor, Malaysia.
- Request for post-registration changes
| Project | 0867 Kim Loong Methane Recovery for Onsite Utilization Project at Kota Tinggi, Johor, Malaysia. |
|---|---|
| PRC ref | PRC-0867-001 |
| Process track | Prior approval |
| DOE | SIRIM |
|
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
| Methodology(ies) list | |
| Standardized baseline(s) list | |
| DOE conducted validation of the changes | Prior to commencement of a verification for the project activity or PoA stated above |
| Type of submission |
Permanent changes from the monitoring plan or the monitoring methodology
Changes to the project or programme design
|
| Applicable crediting period | 01 Feb 09 - 31 Jan 16 |
| Assessment opinion |
Assessment opinion (258 KB)
|
| Revised PDD |
Revised PDD (1889 KB)
Revised PDD - track changes (2040 KB)
|
| Supplementary documents | |
| Signed form |
Signed form (557 KB)
|
| DOE clarification |
|
| VVS version | VVS 2.0 |
| Current status | 08 Jan 13 -
Approved
Effective approval date: 08 Jan 13
|
| Historic statuses |
13 Nov 12 -
Published 28 Nov 12 - Awaiting DOE clarifications 12 Dec 12 - DOE clarifications received 12 Dec 12 - Summary note being prepared 18 Dec 12 - Awaiting EB decision |

Assessment opinion
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: