20:03 02 Jan 25
Project:
0867 Kim Loong Methane Recovery for Onsite Utilization Project at Kota Tinggi, Johor, Malaysia.
- Request for post-registration changes
Project | 0867 Kim Loong Methane Recovery for Onsite Utilization Project at Kota Tinggi, Johor, Malaysia. |
---|---|
PRC ref | PRC-0867-001 |
Process track | Prior approval |
DOE | SIRIM |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | Prior to commencement of a verification for the project activity or PoA stated above |
Type of submission |
Permanent changes from the monitoring plan or the monitoring methodology
Changes to the project or programme design
|
Applicable crediting period | 01 Feb 09 - 31 Jan 16 |
Assessment opinion | Assessment opinion (258 KB) |
Revised PDD | Revised PDD (1889 KB) Revised PDD - track changes (2040 KB) |
Supplementary documents | |
Signed form | Signed form (557 KB) |
DOE clarification |
|
VVS version | VVS 2.0 |
Current status | 08 Jan 13 -
Approved
Effective approval date: 08 Jan 13
|
Historic statuses |
13 Nov 12 -
Published 28 Nov 12 - Awaiting DOE clarifications 12 Dec 12 - DOE clarifications received 12 Dec 12 - Summary note being prepared 18 Dec 12 - Awaiting EB decision |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: