06:51 29 Jan 25
Project
0683 :
Power generation from the proposed 11.2 MW waste heat recovery boiler at the ISA Smelt furnace of the Copper Smelter, Sterlite Industries India Limited (SIIL), Tuticorin
Project title |
Power generation from the proposed 11.2 MW waste heat recovery boiler at the ISA Smelt furnace of the Copper Smelter, Sterlite Industries India Limited (SIIL), Tuticorin
- project design document (632 KB) - registration request form (674 KB) |
---|---|
SDC description report | Not Available. Please refer to our Further Information on SD-Tool |
Host Parties |
India
, involved indirectly
approval (298 KB)
authorization (298 KB)
Authorized Participants: Sterlite Industries (India) Limited |
Other Parties Involved | n/a |
Sectoral scopes | 1 : Energy industries (renewable - / non-renewable sources) |
Activity Scale | LARGE |
Methodologies Used |
ACM0004 ver. 2 -
Consolidated methodology for waste gas and/or heat for power generation
|
Standardized baselines used | N/A |
Amount of Reductions | 22,473 metric tonnes CO2 equivalent per annum |
Fee level | USD 2994.6 |
Validation Report |
Explanation of taking due account of comments (37 KB)
List of documents (56 KB) List of interviewed persons (34 KB) List of interviewed persons (34 KB) Other documents (descriptions provided by the DOE) Validation Report and Protocol (756 KB) Public availability information 2006-10-02 UNFCCC homepage Compilation of all comments received (37 KB) |
Modalities of Communication | |
Registration Date | Rejected (view history) |
Crediting Period | 26 Jul 05 - 25 Jul 15 (Fixed) |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: