Project: 0683 Power generation from the proposed 11.2 MW waste heat recovery boiler at the ISA Smelt furnace of the Copper Smelter, Sterlite Industries India Limited (SIIL), Tuticorin - History
Project 0683: Power generation from the proposed 11.2 MW waste heat recovery boiler at the ISA Smelt furnace of the Copper Smelter, Sterlite Industries India Limited (SIIL), Tuticorin
Request for review Request 1
Request 2
Request 3


EB meeting: EB29
(at which the Board considers the request(s) for review, decides whether to undertake the review and, if so, determine its scope and selects a review team)

Initial comments:
DOE initial response (1177 KB)
PP initial response (4561 KB)
Annexes to PP response (49 KB)
Review Scope (59 KB)

EB meeting: EB30
(at which the report of the review team was/will be considered)