19:26 15 Dec 25
Project:
0683 Power generation from the proposed 11.2 MW waste heat recovery boiler at the ISA Smelt furnace of the Copper Smelter, Sterlite Industries India Limited (SIIL), Tuticorin
- History
| Project | 0683: Power generation from the proposed 11.2 MW waste heat recovery boiler at the ISA Smelt furnace of the Copper Smelter, Sterlite Industries India Limited (SIIL), Tuticorin |
|---|---|
| Request for review |
Request 1
Request 2 Request 3 EB meeting: EB29 (at which the Board considers the request(s) for review, decides whether to undertake the review and, if so, determine its scope and selects a review team) Initial comments: DOE initial response (1177 KB)
PP initial response (4561 KB)
Annexes to PP response (49 KB)
|
| Review |
Scope (59 KB)
EB meeting: EB30 (at which the report of the review team was/will be considered) |

DOE initial response
Annexes to PP response
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: