02:11 27 May 26
Project:
4491 Wastewater Treatment with Biogas System in Palm Oil Mill at Saikhueng, Surat Thani, Thailand
- History
| Project | 4491: Wastewater Treatment with Biogas System in Palm Oil Mill at Saikhueng, Surat Thani, Thailand |
|---|
Data before approval of the request for post-registration changes on 20 Feb 2013
| Link to PRC form | PRC |
|---|---|
| CDM-PDD |
project design document (555 KB)
PDD appendices Appendix 1 - GHGs Calculation TTO1 260111 (158 KB)
Appendix 2 - CAPM calculation 2004-2006 (132 KB)
Appendix 3 - Combined margin_191010 (908 KB)
Appendix 4 - IRR_Calculation_TTO1 171210 (441 KB)
Appendix 5 - TTO1 Letters of withdrawal Nordjysk Elhandel 2010-10-06 (60 KB)
|

project design document
Appendix 1 - GHGs Calculation TTO1 260111
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: