Project: 4491 Wastewater Treatment with Biogas System in Palm Oil Mill at Saikhueng, Surat Thani, Thailand - Request for post-registration changes
Project 4491 Wastewater Treatment with Biogas System in Palm Oil Mill at Saikhueng, Surat Thani, Thailand
PRC ref PRC-4491-001
Process track Prior approval
DOE SIRIM
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? No

Changes to the project or programme design
  • Changes have an impact on: None of the above
Applicable crediting period 01 Apr 11 - 31 Mar 21
Assessment opinion Assessment opinion (186 KB)
Revised PDD Revised PDD (521 KB)   Revised PDD - track changes (593 KB)
Supplementary documents
Signed form Signed form (570 KB)
DOE clarification
VVS version VVS 2.0
Current status 06 Mar 13 - Approved
Effective approval date: 20 Feb 13
Historic statuses 16 Jan 13 - Published
16 Jan 13 - Summary note being prepared
30 Jan 13 - Awaiting EB decision