• Home
  • CDM
  • JI
  • CC:iNet
  • TT:Clear
CDM glossary | Sitemap | FAQ | Contact us | Disclaimer | Extranet | My CDM / Login | Join

UNFCCC

About CDM Governance Rules and Reference Methodologies Standardized Baselines Activity Search Programme of Activities (PoA) CDM co-Benefits Prior Consideration CPA Prior Consideration Validation Requests for Deviation Issuance of CERs Post-Registration Changes Renewal of crediting period CPA-PRC Activities transitioned to 6.4 CDM Registry Stakeholder Interaction Newsroom

Offset now: visit the United Nations Carbon Offset Platform

Connect with us:

twitter facebook linkedin instagram boomerang youtube
UNFCCC radio
Your location: Home > Activity Search
  11:58 18 May 25
Project: 3830 Guayacán Hydroelectric Project - History
Project 3830: Guayacán Hydroelectric Project

Data before approval of the request for post-registration changes on 13 Sep 2013

Link to PRC form PRC
CDM-PDD project design document (1068 KB)


PDD appendices
Appendix 1 - 71. 2005 load duration curve.xls (3339 KB)
Appendix 2 - 72. 2006 load duration curve.xls (3101 KB)
Appendix 3 - 73. 2007 load duration curve.xls (3093 KB)
Appendix 4 - 105.1 Economic Evaluation Model 140110 (196 KB)
Appendix 5 - 112. Chile SIC combined margin 2005-2007.xls (2317 KB)
Appendix 6 - 118. Informe Guayacan v16 ENG (219 KB)
Appendix 7 - 121. calculations for the PDD Guayacan Junio 2010.xls (33 KB)
Appendix 8 - 127b. Economic evaluation model Guayacan (587 KB)