Project: 3830 Guayacán Hydroelectric Project - Request for post-registration changes
Project 3830 Guayacán Hydroelectric Project
PRC ref PRC-3830-001
Process track Issuance
DOE SGS
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? Yes
Applicable crediting period 30 Apr 11 - 29 Apr 18
Assessment opinion Assessment opinion (1230 KB)
Revised PDD Revised PDD (1075 KB)   Revised PDD - track changes (1062 KB)
Supplementary documents
Signed form Signed form (77 KB)
DOE clarification
VVS version VVS 2.0
Current status 13 Sep 13 - Approved
Effective approval date: 13 Sep 13
Historic statuses 15 Aug 13 - Request published