12:45 26 Nov 25
Project
3225 :
Energy efficient power generation in Tirora, India
| Project title |
Energy efficient power generation in Tirora, India
- project design document (1003 KB)
PDD appendices Appendix 1 - Appendix 2_Levelised cost_APML_ Tirora_ver03_101012 (clean) (105 KB)
Appendix 2 - Annex 01 - UMPP-risk-analysis (2117 KB)
Appendix 3 - Annex 02 - RFP Feb 11, 2008 (250 KB)
Appendix 4 - Annex 03 - Coal Mining Bank Guarantee (415 KB)
Appendix 5 - Annex 04 - SBOI Loan Sanction Letter (106 KB)
Appendix 6 - Annex 05 - Information Memorandum (499 KB)
Appendix 7 - Annex 06 - Report by ACMM Pvt Ltd. dated 20.05.2008 (393 KB)
Appendix 8 - Annex 07 - Coal Block Allocation from Ministry of Coal (374 KB)
Appendix 9 - Annex 08 - CRISIL Natural Gas price on power tariff (323 KB)
Appendix 10 - Annex 09 - Gas_levelized_cost (54 KB)
Appendix 11 - Annex 10 - Coal Analysis - EPC contract SCMEC (30 KB)
- registration request form (456 KB)
|
|---|---|
| SDC description report | Not Available. Please refer to our Further Information on SD-Tool |
| Host Parties |
India
, involved indirectly
approval (218 KB)
authorization (218 KB)
Authorized Participants: Adani Power Maharashtra Ltd |
| Other Parties Involved | n/a |
| Sectoral scopes | 1 : Energy industries (renewable - / non-renewable sources) |
| Activity Scale | LARGE |
| Methodologies Used |
ACM0013 ver. 2 -
Consolidated baseline and monitoring methodology for new grid connected fossil fuel fired power plants using a less GHG intensive technology
|
| Standardized baselines used | N/A |
| Amount of Reductions | 1,193,017 metric tonnes CO2 equivalent per annum |
| Fee level | USD 237103.4 |
| Validation Report |
Validation report (921 KB)
Public availability information
Link to information uploaded for public availability |
| Modalities of Communication |
MoC Annex 1 Modalities of Communication valid as of 13/03/2012 MoC Annex 2 (Change/update authorized signatory, name or contact details) valid as of 18/06/2012 |
| Registration Date | 30 Nov 10 (view history) |
| Crediting Period |
01 Jul 12 - 30 Jun 22
(Fixed)
Changed from: 01 Aug 11 - 31 Jul 21 |
| Requests for Issuance
and related documentation |
|

project design document
Appendix 1 - Appendix 2_Levelised cost_APML_ Tirora_ver03_101012 (clean)
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: