Project: 3225 Energy efficient power generation in Tirora, India - History
Project 3225: Energy efficient power generation in Tirora, India
Request for review Request 1
Request 2
Request 3


EB meeting: EB56
(at which the Board considers the request(s) for review, decides whether to undertake the review and, if so, determine its scope and selects a review team)

Initial comments:
Combined DOE and PP Response (77 KB)
Annex 01: UMPP-risk-analysis. (2117 KB)
Annex 02: RFP Feb 11, 2008 (250 KB)
Annex 03: Coal Mining Bank Guarantee. (415 KB)
Annex 04: SBOI Loan Sanction Letter (106 KB)
Annex 05: Information Memorandum (499 KB)
Annex 06: Report by ACMM Pvt Ltd. dated 20.05.2008 (393 KB)
Annex 07: Coal Block Allocation from Ministry of Coal (374 KB)
Annex 08: CRISIL Natural Gas price on power tariff (323 KB)
Annex 09: Gas levelized cost.xls (54 KB)
Annex 10: Coal Analysis - EPC contract SCMEC (30 KB)
Review Scope (131 KB)

EB meeting: EB58
(at which the report of the review team was/will be considered)

Data before corrections

CDM-PDD project design document (644 KB)


PDD appendices
Appendix 1 - Appendix 1_Emission Reduction_APL, Tiroda.xls (47 KB)
Appendix 2 - Appendix 2_Levelised cost_APML_ Tirora_ver03_090921.xls (110 KB)
Appendix 3 - Appendix 2_Levelised cost_APML_ Tirora_ver 02.xls (102 KB)
Appendix 4 - CDM Consideration_08-02-2008.pdf (50 KB)
Appendix 5 - Levelised cost_APML_ver01.xls (97 KB)
Appendix 6 - LoI_MSEDCL.pdf (43 KB)
Appendix 7 - Self declaration issued by APML dated 03092009 .pdf (214 KB)
Appendix 8 - RFQ Notification_MSEDCL.pdf (41 KB)
Appendix 9 - Supply Contract between SCMEC and APML (Project start date).pdf (524 KB)
Validation Report Validation report (764 KB)