Project 2519 : Bhushan Power and Steel Limited–Waste Heat Recovery based Captive Power Project
Project title Bhushan Power and Steel Limited–Waste Heat Recovery based Captive Power Project
- project design document (808 KB)

PDD appendices
Appendix 1 - 1. First of its kind (627 KB)
Appendix 2 - 2. Cost of generation (131 KB)
Appendix 3 - 3. CER calculation sheet (35 KB)
Appendix 4 - 4. CDM consideration (84 KB)
Appendix 5 - 5. JPC Report (1106 KB)
Appendix 6 - 6. cost accountant certificate (2360 KB)
Appendix 7 - 7. Fcap Computation (28 KB)


- registration request form (236 KB)
SDC description report Not Available. Please refer to our Further Information on SD-Tool
Host Parties India , involved indirectly approval (131 KB) authorization (131 KB)
Authorized Participants: Bhushan Power & Steel Limited
Other Parties Involved n/a
Sectoral scopes 1 : Energy industries (renewable - / non-renewable sources)
4 : Manufacturing industries
Activity Scale LARGE
Methodologies Used ACM0012 ver. 2 - Consolidated baseline methodology for GHG emission reductions for waste gas or waste heat or waste pressure based energy system”
Standardized baselines used N/A
Amount of Reductions 333,481 metric tonnes CO2 equivalent per annum
Fee level USD 65196.2
Validation Report Validation report (723 KB) Public availability information
Link to information uploaded for public availability
Modalities of Communication
Registration Date Rejected   (view history)  
Crediting Period 01 Jul 09 - 30 Jun 19 (Fixed)