Project: 2519 Bhushan Power and Steel Limited–Waste Heat Recovery based Captive Power Project - History
Project 2519: Bhushan Power and Steel Limited–Waste Heat Recovery based Captive Power Project
Request for review Request 1
Request 2
Request 3


EB meeting: EB49
(at which the Board considers the request(s) for review, decides whether to undertake the review and, if so, determine its scope and selects a review team)

Initial comments:
Revised SGS Response Letter to Request for Review 2519 (119 KB)
Annex 1- Unit cost analysis_proposal basis (167 KB)
Annex 2 cost verified by accountant 28.10.2002 (4711 KB)
Annex 3 Turbine cost (2142 KB)
Annex 4 Bhushan Ltd Phase - 1 project financials (38 KB)
Annex 5 Boilers offers (2459 KB)
Annex 6 Auxiliary power consumption (18 KB)
Annex 7 Letter from Avant garde & Mecon (714 KB)
Annex 8 Note VP projects to director commercial (328 KB)
Annex 9 - depreciation rate (409 KB)
Annex 10 - Lending Rates (120 KB)
Annex 11 - Grid TARIFF (347 KB)
Annex 12 - Bank Project Report (5879 KB)
Annex 13 - Coal Quotations (868 KB)
Annex 14 - Load distribution (8589 bytes)
Annex 15 - CDM_Bhushan1 (4806 KB)
Annex 16 - SL RN Technology (349 KB)
Annex 17 - PP Response on request for review_150709 (169 KB)
Review Scope (135 KB)

EB meeting: EB50
(at which the report of the review team was/will be considered)