Project: 2375 CERTEL – Cooperativa Regional de Eletrificação Teutônia Ltda - Small Hydropower Plants - History
Project 2375: CERTEL – Cooperativa Regional de Eletrificação Teutônia Ltda - Small Hydropower Plants
Request for review Request 1
Request 2
Request 3


EB meeting: EB50
(at which the Board considers the request(s) for review, decides whether to undertake the review and, if so, determine its scope and selects a review team)

Initial comments:
Sensitivity Analysis request for review (1259 KB)
SGS and PP Combined Response to Request for Review 2375 (148 KB)
Review Scope (106 KB)

EB meeting: EB51
(at which the report of the review team was/will be considered)

Data before corrections

CDM-PDD project design document (2159 KB)


PDD appendices
Appendix 1 - Ref. 11 - Emission Reductions (6309 KB)
Appendix 2 - Ref. 17 - CDM Consideration (135 KB)
Appendix 3 - Ref.12a-SHP Cazuza Ferreira (75 KB)
Appendix 4 - Ref.12b-SHP Rastro de Auto (73 KB)
Appendix 5 - Ref.18-Analise de Sensibilidade (647 KB)
Appendix 6 - WACC Certel (68 KB)
Validation Report Validation report (346 KB)