Project: 1758 Fuel Switching Project of the Aqaba Thermal Power Station (ATPS) - History
Project 1758: Fuel Switching Project of the Aqaba Thermal Power Station (ATPS)
Request for review Request 1
Request 2
Request 3


EB meeting: EB42
(at which the Board considers the request(s) for review, decides whether to undertake the review and, if so, determine its scope and selects a review team)

Initial comments:
DOE/PP Initial comments (76 KB)
Annexure 1 Letter of Award to Alstom and MAG from CEGCO (974 KB)
Annexure 2 Trade Protocol (115 KB)
Annexure 3 ATPS Jordan NPV calculator (483 KB)
Annexure 3 ATPS Jordan NPV calculator v.1 (521 KB)
Annexure 4 Letter_NG pricing (572 KB)
Annexure 5 Current operational Status of 3 Power Plants (478 KB)
Annexure 6 Production Efficiency & Cost Analysis performance Indices Jan-Dec 2002 report (65 KB)
Annexure 7 Supporting to default value of fugitive CH4emisisons v3 (1324 KB)
Annexure 8 CDM PDD UN1758_ver6 (2189 KB)
Annexure 9 Revised UK AR6 CDM.VAL1005 IN01 (336 KB)

Data before corrections

CDM-PDD project design document (1495 KB)
Validation Report Validation report (350 KB)