20:29 13 Nov 25
Project:
9555 Pasak Jolasid Hydropower Project
- History
| Project | 9555: Pasak Jolasid Hydropower Project |
|---|
Data before approval of the request for post-registration changes on 14 Sep 2017
| Link to PRC form | PRC |
|---|---|
| CDM-PDD |
project design document (749 KB)
PDD appendices Appendix 1 - 9555 CDM Consideration (3688 KB)
Appendix 2 - 9555 Benchmark (1617 KB)
Appendix 3 - 9555 GEF Calculation (594 KB)
Appendix 4 - 9555 IRR & CER Calculations (357 KB)
|

project design document
Appendix 2 - 9555 Benchmark
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: