Project: 9555 Pasak Jolasid Hydropower Project - Request for post-registration changes
Project 9555 Pasak Jolasid Hydropower Project
PRC ref PRC-9555-001
Process track Issuance
DOE BVI
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? Yes

Changes to the project or programme design
  • Changes have an impact on: None of the above

Change to the start date of the crediting period
  • Proposed start date of crediting period: 01 Jul 2014
Applicable crediting period 01 Jul 14 - 30 Jun 21
Assessment opinion Assessment opinion (164 KB)
Revised PDD Revised PDD (645 KB)   Revised PDD - track changes (666 KB)
Supplementary documents
Signed form Signed form (938 KB)
DOE clarification
VVS version VVS 9.0
Current status 14 Sep 17 - Approved
Effective approval date: 14 Sep 17
Historic statuses 16 Aug 17 - Request published