02:28 22 Dec 24
Project:
9555 Pasak Jolasid Hydropower Project
- Request for post-registration changes
Project | 9555 Pasak Jolasid Hydropower Project |
---|---|
PRC ref | PRC-9555-001 |
Process track | Issuance |
DOE | BVI |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
Type of submission |
Permanent changes from the monitoring plan or the monitoring methodology
Changes to the project or programme design
Change to the start date of the crediting period
|
Applicable crediting period | 01 Jul 14 - 30 Jun 21 |
Assessment opinion | Assessment opinion (164 KB) |
Revised PDD | Revised PDD (645 KB) Revised PDD - track changes (666 KB) |
Supplementary documents | |
Signed form | Signed form (938 KB) |
DOE clarification | |
VVS version | VVS 9.0 |
Current status | 14 Sep 17 -
Approved
Effective approval date: 14 Sep 17
|
Historic statuses |
16 Aug 17 -
Request published |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: