Project: 9111 7 MW Bundled Hydro power project at Himachal Pradesh of Raajratna Energy Holdings Pvt. Ltd - History
Project 9111: 7 MW Bundled Hydro power project at Himachal Pradesh of Raajratna Energy Holdings Pvt. Ltd

Data before approval of the request for post-registration changes on 27 Oct 2022

Link to PRC form PRC
CDM-PDD project design document (346 KB)
Validation opinion on changes in PDD Validation opinion on changes in PDD (88 KB)

Data before approval of the request for post-registration changes on 30 Dec 2016

Link to PRC form PRC
CDM-PDD project design document (414 KB)


PDD appendices
Appendix 1 - 9111 IRR Calculation (91 KB)
Appendix 2 - 9111 CER Calculation (109 KB)
Appendix 3 - 9111 MD (360 KB)