05:53 28 Dec 24
Project:
9111 7 MW Bundled Hydro power project at Himachal Pradesh of Raajratna Energy Holdings Pvt. Ltd
- Request for post-registration changes
Project | 9111 7 MW Bundled Hydro power project at Himachal Pradesh of Raajratna Energy Holdings Pvt. Ltd |
---|---|
PRC ref | PRC-9111-001 |
Process track | Issuance |
DOE | URS |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
No changes |
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
Type of submission |
Corrections that do not affect project design
|
Applicable crediting period | 01 Jan 13 - 31 Dec 22 |
Assessment opinion | Assessment opinion (88 KB) |
Revised PDD | Revised PDD (346 KB) Revised PDD - track changes (353 KB) |
Supplementary documents | |
Signed form | Signed form (4048 KB) |
DOE clarification | |
VVS version | VVS 9.0 |
Current status | 30 Dec 16 -
Approved
Effective approval date: 30 Dec 16
|
Historic statuses |
01 Dec 16 -
Request published |