      Project:
      9111 7 MW Bundled Hydro power project at Himachal Pradesh of Raajratna Energy Holdings Pvt. Ltd
      - Request for post-registration changes
    
					| Project | 9111 7 MW Bundled Hydro power project at Himachal Pradesh of Raajratna Energy Holdings Pvt. Ltd | 
|---|---|
| PRC ref | PRC-9111-001 | 
| Process track | Issuance | 
| DOE | URS | 
| 
          Methodology(ies) and/or Standardized Baseline(s) 
           applied at the post-registration changes  | 
        No changes | 
| Methodology(ies) list | |
| Standardized baseline(s) list | |
| DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) | 
| Type of submission | 
          
            Corrections that do not affect project design
            
  | 
      
| Applicable crediting period | 01 Jan 13 - 31 Dec 22 | 
| Assessment opinion | 
           Assessment opinion (88 KB)
         | 
      
| Revised PDD | 
           Revised PDD (346 KB)
           
           Revised PDD - track changes (353 KB)
         | 
      
| Supplementary documents | |
| Signed form | 
           Signed form (4048 KB)
         | 
      
| DOE clarification | |
| VVS version | VVS 9.0 | 
| Current status | 30 Dec 16 -
                      Approved
             
              Effective approval date: 30 Dec 16
             
            
           | 
        
| Historic statuses | 
            
              
                
                01 Dec 16 -
                Request published | 
        