03:05 09 Feb 26
Project:
2504 Utilization of waste gas heat for power generation
- History
Data before corrections
| CDM-PDD |
project design document (469 KB)
PDD appendices Appendix 1 - SIIL CER Calculation (80 KB)
Appendix 2 - SIIL IRR incl gas cooling system (368 KB)
Appendix 3 - SIIL Levelised cost per unit COE at 14.5% (246 KB)
|
|---|---|
| Validation Report |
Validation report (1652 KB)
|
Data before approval of the request for post-registration changes on 12 Feb 2013
| Link to PRC form | PRC |
|---|---|
| CDM-PDD |
project design document (639 KB)
PDD appendices Appendix 1 - SIIL CER Calculation (80 KB)
Appendix 2 - SIIL IRR incl gas cooling system (368 KB)
Appendix 3 - SIIL Levelised cost per unit COE at 14.5% (246 KB)
|

response letter RfR 2504
Cost break up for WHRB
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: