15:02 26 Jan 25
Project:
2504 Utilization of waste gas heat for power generation
- Request for post-registration changes
Project | 2504 Utilization of waste gas heat for power generation |
---|---|
PRC ref | PRC-2504-001 |
Process track | Prior approval |
DOE | LRQA |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
Type of submission |
Corrections that do not affect project design
Permanent changes from the monitoring plan or the monitoring methodology
|
Applicable crediting period | 01 Dec 09 - 30 Nov 19 |
Assessment opinion | Assessment opinion (515 KB) |
Revised PDD | Revised PDD (579 KB) Revised PDD - track changes (594 KB) |
Supplementary documents |
Appendix 1 - SIIL-CER sheet(revised) v2.xls (75 KB)
|
Signed form | Signed form (120 KB) |
DOE clarification |
DOE clarification 1 - Rev Validation Opinion_(2504) - PRC ref No. PRC-2504-001.zip (994 KB)
DOE clarification 2 - Revised PDD_(2504) - PRC ref No. PRC-2504-001.zip (1478 KB) |
VVS version | VVS 2.0 |
Current status | 20 Feb 13 -
Approved
Effective approval date: 12 Feb 13
|
Historic statuses |
11 Dec 12 -
Published 25 Dec 12 - Awaiting DOE clarifications 08 Jan 13 - DOE clarifications received 08 Jan 13 - Summary note being prepared 22 Jan 13 - Awaiting EB decision |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: