Project 2500 : CDM Project of Moinho and Barracão Small Hydropower Plant
Project title CDM Project of Moinho and Barracão Small Hydropower Plant
- project design document (667 KB)

PDD appendices
Appendix 1 - Moinho and Barracao EFS (538 KB)
Appendix 2 - Moinho and Barracao Emission Factor (215 KB)
Appendix 3 - Moinho and Barracao Emission Reduction (23 KB)
Appendix 4 - Moinho and Barracao Sensitivity Analysis (28 KB)
Appendix 5 - Moinho and Barracao Wacc (4417 KB)


- registration request form (448 KB)
SDC description report Not Available. Please refer to our Further Information on SD-Tool
Host Parties Brazil , involved indirectly approval (109 KB) authorization (109 KB)
Authorized Participants: Desenvix S.A ; Enerbio Consultoria Ltda
Other Parties Involved n/a
Sectoral scopes 1 : Energy industries (renewable - / non-renewable sources)
Activity Scale LARGE
Methodologies Used ACM0002 ver. 7 - Consolidated methodology for grid-connected electricity generation from renewable sources
Standardized baselines used N/A
Amount of Reductions 15,416 metric tonnes CO2 equivalent per annum
Fee level USD 1583.2
Validation Report Validation report (988 KB) Public availability information
Link to information uploaded for public availability
Modalities of Communication
MoC Annex 1
Modalities of Communication valid as of 07/09/2012
Registration Date 11 Jan 10   (view history)  
Crediting Period 01 Feb 10 - 31 Jan 17 (Renewable - Expired)
Renewal no longer possible
Requests for Issuance
and related documentation