09:57 18 Sep 26
Project
2500 :
CDM Project of Moinho and Barracão Small Hydropower Plant
| Project title |
CDM Project of Moinho and Barracão Small Hydropower Plant
- project design document (667 KB)
PDD appendices Appendix 1 - Moinho and Barracao EFS (538 KB)
Appendix 2 - Moinho and Barracao Emission Factor (215 KB)
Appendix 3 - Moinho and Barracao Emission Reduction (23 KB)
Appendix 4 - Moinho and Barracao Sensitivity Analysis (28 KB)
Appendix 5 - Moinho and Barracao Wacc (4417 KB)
- registration request form (448 KB)
|
|---|---|
| SDC description report | Not Available. Please refer to our Further Information on SD-Tool |
| Host Parties |
Brazil
, involved indirectly
approval (109 KB)
authorization (109 KB)
Authorized Participants: Desenvix S.A ; Enerbio Consultoria Ltda |
| Other Parties Involved | n/a |
| Sectoral scopes | 1 : Energy industries (renewable - / non-renewable sources) |
| Activity Scale | LARGE |
| Methodologies Used |
ACM0002 ver. 7 -
Consolidated methodology for grid-connected electricity generation from renewable sources
|
| Standardized baselines used | N/A |
| Amount of Reductions | 15,416 metric tonnes CO2 equivalent per annum |
| Fee level | USD 1583.2 |
| Validation Report |
Validation report (988 KB)
Public availability information
Link to information uploaded for public availability |
| Modalities of Communication |
MoC Annex 1 Modalities of Communication valid as of 07/09/2012 |
| Registration Date | 11 Jan 10 (view history) |
| Crediting Period |
01 Feb 10 - 31 Jan 17
(Renewable - Expired)
Renewal no longer possible
|
| Requests for Issuance
and related documentation |
|

project design document
Appendix 1 - Moinho and Barracao EFS
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: