Project: 2500 CDM Project of Moinho and Barracão Small Hydropower Plant - History
Project 2500: CDM Project of Moinho and Barracão Small Hydropower Plant
Request for review Request 1
Request 2
Request 3


EB meeting: EB51
(at which the Board considers the request(s) for review, decides whether to undertake the review and, if so, determine its scope and selects a review team)

Initial comments:
Additional information (60 KB)
Revised Table 4 of validation report (77 KB)
Sensitivity Analysis (28 KB)
PDD revised (625 KB)

Data before corrections

CDM-PDD project design document (570 KB)


PDD appendices
Appendix 1 - Moinho and Barracao EFS (538 KB)
Appendix 2 - Moinho and Barracao Emission Factor (215 KB)
Appendix 3 - Moinho and Barracao Emission Reduction (23 KB)
Appendix 4 - Moinho and Barracao Sensitivity Analysis (17 KB)
Appendix 5 - Moinho and Barracao Wacc (4417 KB)
Validation Report Validation report (964 KB)