19:45 25 Jan 25
Project:
2376 Yunnan Tengchong Longchuan River Stage I Hydropower Plant, China
- History
Project | 2376: Yunnan Tengchong Longchuan River Stage I Hydropower Plant, China |
---|---|
Request for review |
Request 1
Request 2 Request 3 |
Data before corrections
CDM-PDD |
project design document (1337 KB)
Tracked Changes N/A
PDD appendices Appendix 1 - ER calculation (69 KB) Appendix 2 - IRR calculation (148 KB) |
---|---|
Validation Report | Validation report (499 KB) |
Data before approval of the request for post-registration changes on 28 Mar 2014
Link to PRC form | PRC |
---|---|
CDM-PDD |
project design document (1337 KB)
PDD appendices Appendix 1 - ER calculation (69 KB) Appendix 2 - IRR calculation (148 KB) |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: