09:09 05 Oct 26
Project:
2376 Yunnan Tengchong Longchuan River Stage I Hydropower Plant, China
- History
| Project | 2376: Yunnan Tengchong Longchuan River Stage I Hydropower Plant, China |
|---|---|
| Request for review |
Request 1
Request 2 Request 3 |
Data before corrections
| CDM-PDD |
project design document (1337 KB)
Tracked Changes N/A
PDD appendices Appendix 1 - ER calculation (69 KB)
Appendix 2 - IRR calculation (148 KB)
|
|---|---|
| Validation Report |
Validation report (499 KB)
|
Data before approval of the request for post-registration changes on 28 Mar 2014
| Link to PRC form | PRC |
|---|---|
| CDM-PDD |
project design document (1337 KB)
PDD appendices Appendix 1 - ER calculation (69 KB)
Appendix 2 - IRR calculation (148 KB)
|

project design document
Appendix 1 - ER calculation
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: