Project: 2376 Yunnan Tengchong Longchuan River Stage I Hydropower Plant, China - Request for post-registration changes
Project 2376 Yunnan Tengchong Longchuan River Stage I Hydropower Plant, China
PRC ref PRC-2376-001
Process track Issuance
DOE LGAI Tech. Center S.A
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? Yes
Applicable crediting period 25 May 09 - 24 May 16
Assessment opinion Assessment opinion (415 KB)
Revised PDD Revised PDD (841 KB)   Revised PDD - track changes (842 KB)
Supplementary documents
Signed form Signed form (145 KB)
DOE clarification
VVS version VVS 2.0
Current status 28 Mar 14 - Approved
Effective approval date: 28 Mar 14
Historic statuses 27 Feb 14 - Request published