17:13 10 Jan 25
Project:
2376 Yunnan Tengchong Longchuan River Stage I Hydropower Plant, China
- Request for post-registration changes
Project | 2376 Yunnan Tengchong Longchuan River Stage I Hydropower Plant, China |
---|---|
PRC ref | PRC-2376-001 |
Process track | Issuance |
DOE | LGAI Tech. Center S.A |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
Type of submission |
Permanent changes from the monitoring plan or the monitoring methodology
|
Applicable crediting period | 25 May 09 - 24 May 16 |
Assessment opinion | Assessment opinion (415 KB) |
Revised PDD | Revised PDD (841 KB) Revised PDD - track changes (842 KB) |
Supplementary documents | |
Signed form | Signed form (145 KB) |
DOE clarification | |
VVS version | VVS 2.0 |
Current status | 28 Mar 14 -
Approved
Effective approval date: 28 Mar 14
|
Historic statuses |
27 Feb 14 -
Request published |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: