Project: 1059 Substitution of coal with jute biomass residue (caddies) in the steam generating boiler for use on-site - Issuance Request
Project 1059: Substitution of coal with jute biomass residue (caddies) in the steam generating boiler for use on-site
 
ISSUANCE STATUS Issued (on 28 Oct 09)  
Monitoring period 01 Apr 08 - 31 Mar 09
Monitoring report Monitoring report (301 KB)
 
Request for issuance Signed form (498 KB)

Before corrections:
Signed form (498 KB)
Amount of CERs CERs issued up to 31 December 2012: 5,283
Serial Range: Block start: IN-5-71992523-1-1-0-1059     Block end: IN-5-71997805-1-1-0-1059


Before corrections:
5283
Verification and certification reports Certification report (77 KB)
Verification report (448 KB)

Before corrections:
Certification report (77 KB)
Verification report (442 KB)
Additional documents HMCL 2 Monitoring Report (314 KB)
HMCL 2 Emission Reduction Calculation (26 KB)

Before corrections:
HMCL 2 Monitoring Report (314 KB)
HMCL 2 Emission Reduction Calculation (26 KB)
Request for review Request 1
Request 2
Request 3


EB meeting: EB50
(at which the Board considers the request(s) for review, decides whether to undertake the review and, if so, determine its scope and selects a review team)

Initial comments:
DOE initial comments (44 KB)
Annex 1 : Extract of Board note dated 24th April mentioning that the coal fired boiler would be dismantled (371 KB)
Verification Report (448 KB)