18:11 10 Mar 26
Issuance Request for Review Form
|
CDM project activity/programme of activities issuance request review form (CDM-ISSR-FORM) (Version 03.0) |
|---|
| Project title of the project activity or programme of activities (PoA) for which issuance is requested | Substitution of coal with jute biomass residue (caddies) in the steam generating boiler for use on-site (1059) |
|---|---|
| DOE that requested for issuance and date of request | TÜV NORD (02 Jul 09) |
| Please indicate, in accordance with paragraphs 65 of the CDM modalities and procedures, for which reason(s) you request review | |
| Incompetence | |
| Please indicate reasons for the request for review | |
|
OTHER ISSUES:
The DOE raised FAR2 in the previous verification report which required the project participant to install a dedicated separate steam flow meter to avoid any future error from common steam flow metering and closed this FAR during this verification based on the fact that the coal fired boiler was not operational and there was no coal consumption during this monitoring period. Further clarification is required on how the DOE closed the FAR2 considering that one stand-by coal fired boiler can generate steam for future monitoring period. |
|
| Date | 11 Sep 09 |

Offset now: visit the United Nations Carbon Offset Platform
Connect with us: