12:40 20 Jan 25
Project
10619 :
Methane capture project
Project title |
Methane capture project
- project design document (1664 KB) PDD appendices Appendix 1 - ER Sheet (333 KB) Appendix 2 - IRR Sheet (26 KB) - registration request form (45 KB) |
---|---|
SDC description report | Not Available. Please refer to our Further Information on SD-Tool |
Host Parties |
Indonesia
, involved indirectly
approval (446 KB)
authorization (446 KB)
Authorized Participants: PT. Tintin Boyok Sawit Makmur |
Other Parties Involved | n/a |
Sectoral scopes |
1 : Energy industries (renewable - / non-renewable sources)
13 : Waste handling and disposal |
Activity Scale | SMALL |
Methodologies Used |
AMS-III.H. ver. 19 -
Methane recovery in wastewater treatment
|
Standardized baselines used | N/A |
Amount of Reductions | 58,985 metric tonnes CO2 equivalent per annum |
Fee level | USD 10297.0 |
Validation Report |
VVS/VVM version:
VVS-PA 2.0
Validation report (1377 KB) Public availability information Link to information uploaded for public availability |
Modalities of Communication | |
Registration Date | Withdrawn (view history) completeness check: complete info & rep check: concluded |
Crediting Period | 15 Dec 20 - 14 Dec 30 (Fixed) |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: