Methane capture project at PT.Tintin Boyok Sawit Makmur
[]
Host party(ies) Indonesia
Methodology(ies) AMS-III.H. ver. 19
Standardised Baselines N/A
Estimated annual reductions* 58,985
Proposed start date of PA 01 Aug 20
Start date of first crediting period. 01 Sep 21
Length of first crediting period. 10 years
DOE/AE KBS Certification Services Limited
Period for comments 23 Apr 20 - 22 May 20 (23:59:59 GMT)
PP(s) for which DOE have a contractual obligation LG International
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (789 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE
The comment period is over.
No comments received.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs