Project: 3759 Methane Recovery Project of Jiangsu Lianhai Bioengineering Co., Ltd. - History
Project 3759: Methane Recovery Project of Jiangsu Lianhai Bioengineering Co., Ltd.
Request for review Request 1
Request 2
Request 3
Review documentation
Clarification documents JCI Response (331 KB)
21 Similar projects (3340 KB)
22 FSR for productio facilities (1537 KB)
23 Biomass Heat Value (101 KB)
24 Monthly Production (1122 KB)
25 Analysis on Present Situation (689 KB)
26 Biomass Power Generation (543 KB)
27 Possibility to import heat (349 KB)


Data before review

CDM-PDD project design document (1275 KB)

PDD appendices
Appendix 1 - NPV VAL-08-014 (163 KB)
Appendix 2 - ER Cal VAL-08-014 (63 KB)
Appendix 3 - Wastewater estimation (2282 KB)
Appendix 4 - Baseline scenario (2974 KB)
Appendix 5 - Theories and desings (1099 KB)
Appendix 6 - FSR for Huguan Yufeng (871 KB)
Appendix 7 - Certificates (1416 KB)
Appendix 8 - Biogas treatment (1076 KB)
Appendix 9 - Operational cost (1931 KB)
Appendix 10 - Labour cost (2086 KB)
Appendix 11 - Insurance cost (1763 KB)
Appendix 12 - Electricity cost (1010 KB)
Appendix 13 - Administration cost (2317 KB)
Appendix 14 - Water tariff (575 KB)
Appendix 15 - Land lease cost (2120 KB)
Appendix 16 - Coal price (790 KB)
Appendix 17 - IC supply list (1045 KB)
Appendix 18 - Similar Projects (2065 KB)
Appendix 19 - Measures for CDM Projects (543 KB)
Appendix 20 - Approval of Jiangsu Lianhai (390 KB)
Validation Report Validation report (2990 KB)

Data before approval of the request for post-registration changes on 09 Jan 2013

Link to PRC form PRC
CDM-PDD project design document (977 KB)


PDD appendices
Appendix 1 - NPV VAL-08-014 (163 KB)
Appendix 2 - ER Cal VAL-08-014 (63 KB)
Appendix 3 - Wastewater estimation (2282 KB)
Appendix 4 - Baseline scenario (2974 KB)
Appendix 5 - Theories and desings (1099 KB)
Appendix 6 - FSR for Huguan Yufeng (871 KB)
Appendix 7 - Certificates (1416 KB)
Appendix 8 - Biogas treatment (1076 KB)
Appendix 9 - Operational cost (1931 KB)
Appendix 10 - Labour cost (2086 KB)
Appendix 11 - Insurance cost (1763 KB)
Appendix 12 - Electricity cost (1010 KB)
Appendix 13 - Administration cost (2317 KB)
Appendix 14 - Water tariff (575 KB)
Appendix 15 - Land lease cost (2120 KB)
Appendix 16 - Coal price (790 KB)
Appendix 17 - IC supply list (1045 KB)
Appendix 18 - Similar Projects (2065 KB)
Appendix 19 - Measures for CDM Projects (543 KB)
Appendix 20 - Approval of Jiangsu Lianhai (390 KB)