Project 7139 : Hubei Shiyan Longbeiwan Hydropower Station
Project title Hubei Shiyan Longbeiwan Hydropower Station
- project design document (914 KB)

PDD appendices
Appendix 1 - Longbeiwan ER sheet_20120824_ page.xls (91 KB)
Appendix 2 - Longbeiwan IRR (0% line loss and 0% auxilliary consuption)_20120824.xls (103 KB)
Appendix 3 - Longbeiwan IRR (operaion hour of 2928)_20120824.xls (103 KB)
Appendix 4 - Longbeiwan IRR (zero O&m cost)_20120824.xls (103 KB)
Appendix 5 - Longbeiwan IRR_20120824.xls (117 KB)


- registration request form (291 KB)
SDC description report Not Available. Please refer to our Further Information on SD-Tool
Host Parties China , involved indirectly approval (3025 KB) authorization (3025 KB)
Authorized Participants: Hubei Jingneng Longbeiwan Hydropower Development Co., Ltd.
Other Parties Involved Netherlands , involved indirectly approval (153 KB) authorization (153 KB)
Authorized Participants: Deutsche Bank AG, London Branch (withdrawn)
Sectoral scopes 1 : Energy industries (renewable - / non-renewable sources)
Activity Scale LARGE
Methodologies Used ACM0002 ver. 12 - Consolidated baseline methodology for grid-connected electricity generation from renewable sources
Standardized baselines used N/A
Amount of Reductions 297,503 metric tonnes CO2 equivalent per annum
Fee level USD 58000.6
Validation Report VVS/VVM version: VVM 1.2
Validation report (628 KB) Public availability information
Link to information uploaded for public availability
Modalities of Communication
MoC Annex 1
Modalities of Communication valid as of 08/01/2014
MoC Annex 2 (Withdraw Project Participant) valid as of 07/01/2014
Registration Date 06 Sep 12 (Date of registration action 07 Dec 12)   (view history)   completeness check: complete info & rep check: concluded
Crediting Period 01 Jun 14 - 31 May 21 (Renewable - Expired)
Renewal no longer possible
Requests for Issuance
and related documentation