20:02 28 Oct 25
Project:
10080 Rondinha Small Hydroelectric Power Plant
- Crediting Period Renewal Request
[]
| Project |
10080: Rondinha Small Hydroelectric Power Plant
- project design document (978 KB)
PDD appendices Appendix 1 - Emission Reductions_Rondinha Renewal_V01 (147 KB)
- crediting period renewal form (203 KB)
|
|---|---|
| Methodologies Used |
ACM0002 ver. 20 -
Grid-connected electricity generation from renewable sources
|
| VVS Version | VVS-PA 3.0 |
| Standardized baselines used | N/A |
| Amount of Reductions | 9,127 metric tonnes CO2 equivalent per annum |
| Validation Opinion |
Validation opinion (488 KB)
|
| Renewal Date | 13 Apr 23 (Renewable) Provisional (awaiting guidance from the CMP at CMP 16) (view history) completeness check: complete info & rep check: concluded |
| Crediting Period (requested for renewal) |
01 Jan 22 - 31 Dec 28
Other crediting period(s): 01 Jan 15 - 31 Dec 21 |
| Requests for Issuance
and related documentation |
|

project design document
Appendix 1 - Emission Reductions_Rondinha Renewal_V01
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: