Project: 7458 Valle de los Vientos Wind Farm - Crediting Period Renewal Request
[]
Project 7458: Valle de los Vientos Wind Farm

- project design document (1719 KB)

PDD appendices
Appendix 1 - ER Spreadsheet (20 KB)
Appendix 2 - EF Spreadsheet 2018 (1214 KB)
Appendix 3 - EF Spreadsheet 2019 (1195 KB)
Appendix 4 - EF Spreadsheet 2020 (1319 KB)

- crediting period renewal form (47 KB)
Methodologies Used ACM0002 ver. 20 - Grid-connected electricity generation from renewable sources
VVS Version VVS-PA 3.0
Standardized baselines used N/A
Amount of Reductions 117,678 metric tonnes CO2 equivalent per annum
Validation Opinion Validation opinion (462 KB)
Renewal Date 03 Mar 22 (Renewable) Provisional (awaiting guidance from the CMP at CMP 16)   (view history)   completeness check: complete info & rep check: concluded
Crediting Period (requested for renewal) 01 Jan 21 - 31 Dec 27

Other crediting period(s): 01 Jan 14 - 31 Dec 20
Requests for Issuance
and related documentation