Project: 5999 Eco Energy Beer Tuvya - Animal manure anaerobic treatment facility - Crediting Period Renewal Request
[]
Project 5999: Eco Energy Beer Tuvya - Animal manure anaerobic treatment facility

- project design document (578 KB)

PDD appendices
Appendix 1 - ER_5999 (147 KB)
Appendix 2 - Grid_5999 (415 KB)

- crediting period renewal form (44 KB)
Methodologies Used AM0073 - GHG emission reductions through multi-site manure collection and treatment in a central plant
VVS Version VVS-PA 3.0
Standardized baselines used N/A
Amount of Reductions 246,723 metric tonnes CO2 equivalent per annum
Validation Opinion Validation opinion (425 KB)
Renewal Date 10 Mar 22 (Renewable) Provisional (awaiting guidance from the CMP at CMP 16)   (view history)   completeness check: complete info & rep check: concluded
Crediting Period (requested for renewal) 01 Jan 21 - 31 Dec 27

Other crediting period(s): 01 Jan 14 - 31 Dec 20
Requests for Issuance
and related documentation