07:38 07 Nov 25
Project:
5999 Eco Energy Beer Tuvya - Animal manure anaerobic treatment facility
- Crediting Period Renewal Request
[]
| Project |
5999: Eco Energy Beer Tuvya - Animal manure anaerobic treatment facility
- project design document (578 KB)
PDD appendices Appendix 1 - ER_5999 (147 KB)
Appendix 2 - Grid_5999 (415 KB)
- crediting period renewal form (44 KB)
|
|---|---|
| Methodologies Used |
AM0073 -
GHG emission reductions through multi-site manure collection and treatment in a central plant
|
| VVS Version | VVS-PA 3.0 |
| Standardized baselines used | N/A |
| Amount of Reductions | 246,723 metric tonnes CO2 equivalent per annum |
| Validation Opinion |
Validation opinion (425 KB)
|
| Renewal Date | 10 Mar 22 (Renewable) Provisional (awaiting guidance from the CMP at CMP 16) (view history) completeness check: complete info & rep check: concluded |
| Crediting Period (requested for renewal) |
01 Jan 21 - 31 Dec 27
Other crediting period(s): 01 Jan 14 - 31 Dec 20 |
| Requests for Issuance
and related documentation |
|

project design document
Appendix 1 - ER_5999
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: